Rigid 4-Lane Highway — DBL
Rigid pavement highway stretch for heavy freight corridors, built with laser-guided PQC and strict MoRTH quality compliance.
Project overview
This project involved constructing a rigid 4-lane highway designed to handle heavy freight traffic. The corridor required durable pavement, strict adherence to quality standards, and careful execution to ensure smooth, long-lasting road infrastructure.
Scope of work
- Rigid concrete pavement for 4-lane highway
- Pavement subgrade preparation and drainage works
- Road shoulders, intersections, and ramps
- Construction of culverts and cross-drainage structures
- Quality control and phased handover
Challenges
- Maintaining high-quality standards across long stretches
- Construction in high-traffic and uneven terrain areas
- Coordinating multiple subcontractors and equipment
Our approach
The project was divided into work zones with phased execution to manage resources efficiently. Strict quality control was implemented at every stage. Supervisory teams ensured smooth traffic management, while regular inspections maintained standards and minimized delays.
Outcome
- Durable 4-lane highway built to handle heavy freight
- High-quality pavement with precise alignment
- Smooth execution with minimal disruptions
- Safe, long-lasting transport infrastructure delivered on schedule
