10 MW Captive Power Plant — Risen Industries

10 MW Captive Power Plant — Risen Industries

Reliable captive power for intensive industrial operations.

Project Details

Risen Industries required a dependable captive power source to reduce grid dependency and bring stability to its production lines. Aakar Infra executed the complete civil and balance-of-plant scope for a 10 MW captive power plant, built around strict safety, quality and schedule controls.

Client: Risen Industries

Location: Sarda, Bemetra, Chhattisgarh

Sector: Power

Services: Civil works, balance-of-plant, foundations, structures

Capacity: 10 MW captive power

Year: 2023

Status: Completed

Project overview

Risen Industries was expanding production and needed a captive power plant that could run reliably under continuous load. The project called for a civil contractor that could coordinate with equipment suppliers, handle complex foundations and maintain a safe work environment in an already active industrial campus. Aakar Infra stepped in as the construction partner for the complete civil and BOP works, from site preparation to final handover.

Scope of work
Foundations for boiler, turbine and generator areas
Civil works for control room, MCC building and auxiliary structures
Chimney and miscellaneous equipment foundations
Cable trenches, drains and internal roads around the power block
Balance-of-plant civil works, including water systems and utility areas
Challenges
Working inside a running industrial facility with limited shutdown windows
Tight schedule linked to the client’s production ramp-up plans
Coordination with multiple vendors, consultants and equipment suppliers
Our approach

Aakar Infra started with a detailed review of drawings and methodology, followed by a phased construction plan that respected shutdown timings and safety norms. Survey control points were fixed early, which helped maintain alignment across major foundations. Dedicated teams handled high-risk areas around heavy equipment. Daily coordination meetings with the client and EPC partners kept decisions quick and documentation clear.

 

Outcome
  • Civil and BOP works completed within the agreed schedule
  • Stable foundation system supporting long-term power plant operation
  • Safe execution with strict HSE compliance across all work fronts
  • Reduced power cost and improved energy security for Risen Industries